Project Finance modelling proposal for the economic exploitation of parks in urban perimeters: the case of PNMNI (Brazil)

Authors

DOI:

https://doi.org/10.37230/CyTET.2023.218.11

Keywords:

Urban Natural Parks, Pheryurban development, Project Finance, Public Private Partnership

Abstract

Urban natural parks are relevant to promote ecological and sustainable growth of cities. The
Parque Natural Municipal-PNMNI, in Nova Iguaçu (Brazil), lacks physical infrastructure or adequate
management, harming its socio-environmental and economic functions. A Public-Private Partnership
(PPP) model is proposed to rehabilitate the park. The revitalization of PNMNI has internal rates of return
(IRR) of 16% and 47%, respectively, in two evaluated scenarios, and a cost-benefit ratio of over 10
times. Moreover, the investment payback period is less than 4 years in the most likely scenario. The
proposal of a PPP model for urban and/or peri-urban parks is relevant, as there are few studies on the
subject in the literature and it is related to relevant social, economic, and cultural issues.

References

AMARAL, R. M. DO & AFONSO, H. C. A. DA G. (2022): Áreas Verdes e as Potencialidade do Parque Natural Municipal de Nova Iguaçu (PNMNI) para a Hipótese da Cesta de Bens e Serviços Territoriais. Revista Produção e Desenvolvimento, 8(e618), 1–13. https://doi.org/10.32358/rpd.2022.v8.618

BABATUNDE, S. O. & PERERA, S. (2017): Barriers to bond financing for public-private partnership infrastructure projects in emerging markets: A case of Nigeria. Journal of Financial Management of Property and Construction, v. 22, n. 1, p. 2–19.

BAO, F. & CHAN, A. P. C. & CHEN, C. & DARKO, A. (2018): Review of Public–Private Partnership Literature from a Project Lifecycle Perspective. American Society of Civil Engineers/Journal of Infrastructure Systems.

BAUR, J. W. R. & TYNON, J. F. (2010): Small-Scale Urban Nature Parks: Why Should We Care? Leisure Sciences, v. 32, n. 2, p. 195–200.

BEZERRA, P. I. S. (2011): Utilização dos Incentivos Fiscais domo Mecanismo para Promover a Sustentabilidade Ecológica na Administração Pública e Privada. Rev. Fac. Direito UFMG, Belo Horizonte, n. 59, p. 307 a 336.

BORGES, L. F. X. (1998): Project Finance e Infraestrutura: Descrição e Críticas. Revista do BNDES V.5, N.9, P 105-122 Rio de Janeiro.

BORGES, P. P. & OLIVEIRA, L. Y. Q. (2018): O direito à cidade e o desenvolvimento local como base para a humanização do espaço urbano. Interações (Campo Grande), v. 19, n. 4, p. 739.

BORBA, J. E. T. (2008): Direito Societário.11 ed. São Paulo: Renovar

BOTELHO, E. S. & MACIEL, G. G. (2019): A reprodução capitalista do espaço por meio da concessão de serviços e as implicações no lazer dos visitantes no Parque Nacional da Tijuca –RJ. Caderno Virtual de Turismo, v. 18, n. 3.

BRUMATTI, P. N. & SANTANA, C. M. & DANTAS, F. R. & JÚNIOR, S. M. (2018): Percepção de estudantes quanto aos impactos na criação e visitação de parques naturais protegidos. Revista Brasileira de Ecoturismo (RBEcotur), v. 11, n. 4.

CABRERA, A. D. & MORALES, L. M. (2020): Public-Private Partnership and Infrastructure: An Empirical Study from Latin America. Journal of Entrepreneurship & Project Management, 4(2), 34-46.

CHIESURA, A. (2004): The role of urban parks for the sustainable city. Landscape and Urban Planning, v. 68, n. 1, p. 129–138.

COFFEY, W. J. & POLÈSE, M. (1984): The Concept of Local Development: A Stages Model of Endogenous Regional Growth. Papers of The Regional Science Association, VOL. 55.

CUNHA, L. G.; (2018): As Concessões de Isenções e os Impactos Positivos e Negativos nas Contas Públicas. Artigo Científico apresentado como exigência de conclusão de Curso de Pós-Graduação Lato Sensu da Escola de Magistratura do Estado do Rio de Janeiro. Rio de Janeiro.

DE LA RIVA, I. (2017): Nuevos modelos de financiación de infraestructuras públicas. Revista Digital de Derecho Administrativo, n. 17, p. 193.

DIAZ-VILLAVICENCIO, G. (2020). Educational Evaluation of the Federal University of Latin American Integration, Brazil. Revista Produção e Desenvolvimento, 6. https://doi.org/10.32358/rpd.2020.v6.433

ECO, U. (1995): ¿Cómo se hace una tesis? Técnicas y procedimientos de estudio, investigación y escritura. Traducción de Lucía Baranda y Alberto Claveria Ibáñez. 1ª ed., Barcelona: Gedisa, 1995, 265p.

FARIA, V. C. S. (2003): O Papel do Project finance no Financiamento de Projetos de Energia Elétrica: O Caso da UHE Cana Brava. Dissertação. Pós-Graduação de Engenharia em Planejamento Energético. UFRJ. Rio de Janeiro.

FARINA, E. (1990): A Teoria dos Mercados Contestáveis e a Teoria da Organização Industrial: Um artigo-resenha. Estudos Econômicos, vol. 2, nº 1, jan.-abr. São Paulo:1990.

FERREIRA, L. D. O. (2019): Governança em Áreas Naturais Protegidas: Uma análise na perspectiva do lazer, turismo e violência no Parque Estadual do Utinga/PA e Parque Estadual Dunas do Natal/RN. Dissertação. Pós Graduação em Turismo. UFRN. Natal.

FISCHER, T. M. D., & MELO, V. P. (2004): Organizações e interorganizações na gestão do desenvolvimento sócio territorial. Revista Organização & Sociedade, vol. 11, Edição Especial, Jan-Dec 2004, pp. 13-41. https://doi.org/10.1590/1984-9110002

GARAYALDE, M. L. & GONZÁLEZ, S. & MASCAREÑAS, J. (2019): “Project Finance” y desarrollo económico. Estudio de un caso. REVESCO. Revista de Estudios Cooperativos, v. 130.

GOMES, C. H. M. & SANTOS, J. D. S. C., & CORDEIRO, J. S. S. (2020): Potencialidades do Parque Natural Municipal de Nova Iguaçu na Região Turística Baixada Verde (RJ). Revista Eletrônica Uso Público Em Unidades de Conservação, 8(12), 1–11. https://doi.org/10.47977/2318-2148.2020.v8n12p1

GUILHEN, A. J.; (2014): A Parceria Público-Privada com Instrumento Urbanístico: O caso do município de São Paulo – SP. Tese de pós-graduação em Engenharia Urbana da Universidade Federal de São Carlos. São Carlos, 2014. In: https://repositorio.ufscar.br/handle/ufscar/4194?show=full

GUMIERO, R. G., & TIGRE, A. M. L. (2020). Evaluation of policies for regional development: Unifesspa actions for social inclusion and empowerment in Pará Amazônia. Revista Produção e Desenvolvimento, 6. https://doi.org/10.32358/rpd.2020.v6.474

GUNDOGDU, A. S. (2019): Determinants of Success in Islamic Public-Private Partnership Projects (PPPs) in the Context of SDGs. Turkish Journal of Islamic Economics, v. 6, n. 2, p. 25–43.

HERNÁNDEZ SAMPIERI, R. & TORRES, C. P. M. (2018): Metodología de la investigación: las rutas cuantitativa, cualitativa y mixta. México: McGraw-Hill, 2018, 736p.

INTITUTO BRASILEIRO DE GEOGRAFIA E ESTATÍSTICA, IBGE (2019): Censo Demográfico e Contagem Populacional 2000. Acesso: nov/2019.

INTITUTO BRASILEIRO DE GEOGRAFIA E ESTATÍSTICA, IBGE (2023): Cidades/Panorama. https://cidades.ibge.gov.br

KALAOUN, F. & TRIGO, L. G. G. (2021): A região turística da Baixada Fluminense (RJ): entre o verde e a violência. Revista Acadêmica Observatório de Inovação do Turismo. v. 15, n. 2, agosto/2021. Rio de Janeiro.

KAYSER, D. (2013): Recent Research in Project Finance – A Commented Bibliography. Procedia Computer Science, v. 17, p. 729–736.

LOUKAITOU SIDERIS, A. & MUKHIJA, V. (2019): Promoting justice for underserved groups in periurban parks: the potential of state-community partnerships, Leisure Studies, 38:1, 43-57.

MAYER, M. (2014): Can nature-based tourism benefits compensate for the costs of national parks? A study of the Bavarian Forest National Park, Germany. Journal of Sustainable Tourism, v. 22, n. 4, p. 561–583.

ORGANIZACIÓN PARA LA COOPERACIÓN Y EL DESARROLLO ECONÓMICOS ,OCDE (2012): Recommendation of the Council on Principles for Public Governance of Public-Private Partnerships.

OLIVEIRA, F. L., & COSTA, N. M. C. DA. (2019): O Valor Geoturístico da Paisagem do Parque Natural Municipal de Nova Iguaçu (Rio de Janeiro). https://conferencias.ufrj.br/index.php/wac/wap2017/paper/download/1687/40

OWOLABI, H., OYEDELE, L., ALAKA, H., AJAYI, S., BILAL, M., & AKINADE, O. (2019). RISK MITIGATION IN PFI/PPP PROJECT FINANCE. BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 10(1), 28–49. doi:10.1108/bepam-09-2018-0120

PAINULY, J.O. (2009): “Financing energy efficiency: lessons from experience in India and China”, International Journal of Energy Sector Management, Vol. 3 No. 3, pp. 293-307.

PINTO, J. M. & ALVES, P. P. (2016): The Choice between Project Financing and Corporate Financing: Evidence from the Corporate Syndicated Loan Market. SSRN, http://dx.doi.org/10.2139/ssrn.2876524

QUEIROZ, E. D. DE. Uso público no Parque Natural Municipal de Nova Iguaçu-RJ: trilhando entre possibilidades e dificuldades (2018): 206 f. Tese (Doutorado em Geografia) – Programa de Pós-Graduação em Geografia, Instituto de Geociências, Universidade Federal Fluminense, Niterói, 2018. http://app.uff.br/riuff/handle/1/28340

RODRIGUES, C. G. O. & GODOY, L. R. C. (2013): Atuação pública e privada na gestão de unidades de conservação: aspectos socioeconômicos da prestação de serviços de apoio à visitação em parques nacionais. In: Desenvolvimento e meio Ambiente, v. 28, p. 75-88. Editora UFPR.

SANTOS, J. da S. C. (2014): Uso público em parques: estudo de caso PNMNI. Monografia. Rio de Janeiro; UFRRJ, 82p.

SANTOS, S. (2003): Aplicação do Project Finance Para Alavancagem de Empreendimentos Hidrelétricos de Pequeno Porte. Dissertação. Pós-Graduação em Engenharia de Energia e Planejamento Energético. UNIFEI. Itajubá.

SANTOS, E. N. & NESPOLO, D. & KRONHARDT J. & SAUSEN, O. T. & DOMÊNICO, D. D. (2017): Utilização de Incentivos Fiscais como uma ferramenta do Planejamento Tributário: O caso de uma indústria de embarcações localizada na Zona Franca de Manaus. XVII Mostra de Iniciação Científica, Pós-Graduação, Pesquisa e Extensão. Caxias do Sul.

VERGARA, S. C.(2016): Projetos e relatório de pesquisa em administração. 16ª edição. São Paulo: Atlas, 2016, 104p.

WORLDBANK GROUP. (2014): Public-Private Partnerships – Reference Guide, Version 2.0.

WORLDBANK GROUP. (2020): Primary sectors ranked by investment, 1990 - 2019(US$ million). In.: https://ppi.worldbank.org/en/snapshots/rankings.

WORLDBANK GROUP. (2020): Annual PPI Database Global Report, 2019.

ZAGO, C. A. & WEISE, A. D. & HORNBURG, R. A. (2009): A Importância do Estudo de Viabilidade Econômica de Projetos nas Organizações Contemporâneas. VI Congresso Virtual Brasileiro de Administração.

ZHU, L. & CHUA, D. K. H. (2018): Identifying Critical Bankability Criteria for PPP Projects: The Case of China. Advances in Civil Engineering, v. 2018, p. 1–11.

Published

2023-12-18

How to Cite

Costa-Alegre-da-Gama-Afonso, H., Da-Silva-Menezes, A., Silva-Dos-Santos, A. M., Mendonça-Castilho, A. P. ., & Ribeiro-Mello, A. J. . (2023). Project Finance modelling proposal for the economic exploitation of parks in urban perimeters: the case of PNMNI (Brazil). Ciudad Y Territorio Estudios Territoriales, 55(218), 1195–1214. https://doi.org/10.37230/CyTET.2023.218.11